Disclaimer: In case of any mismatch between
the information provided in the complete policy document and information provided
on this page, the complete policy document information needs to be considered valid. Complete
policy document can be downloaded Here
Prescribed minimum standards
Besides the development as per the satisfaction of DDA, the agency shall maintain the park to ensure the following.
-
Pathways, planters, toe walls are maintained and timely repaired, if required.
-
Regular and timely disposal of garbage and other wastes from the park as per prevalent MCD norms.
-
No labor hutments or any other un-wanted structure to exist in the park.
-
Install and maintain 01unit open multi gymnasium.
-
Provide park furniture @01 shelter/05 acres, 04 benches/acre and 04 dustbins/acre of innovative ecofriendly material.
-
Provision and upkeep of zero waste toilet facilities near major entrances, with regular cleaning and maintenance as per required schedule.
-
Drinking water facilities to be made available near entrances and as per requirement.
-
Number of Malis deputed on site should be at least @01 Mali/acre
-
Water economic plantation to be implemented.
-
Rain water as surface run off to be harvested wherever possible.
-
The high maintained lawn, shrubbery and tree plantation to be logically proportioned as per approved planting plan.
-
Dedicated seasonal beds to be made available as per design and at least two seasonal changes to be ensured.
-
Lighting to accommodate solar lighting distributed as approved lighting scheme.
-
Proposal for regular irrigational methods to be made and implemented.
-
Measures for security of the parks be made.
-
Public art installation to be encouraged.
-
Provision of temporary Kiosks for sale of relevant commodities may be explored.